Manufacturing
193,789 SF
15.0%
7.5 acres
4
1950
22’ (Bldg. 1) / 24’ (Bldg. 2)
9
7
N/A
158
Steel frame, CMU, brick
Bldg 1- built up , synthetic rubber & concrete. Bldg 2-built up , synthetic rubber &smooth surfaced built up tar membrane
20+
Roof mounted package units, hot water radiant heat, and gas-fired overhead space heaters
N/A
Wet-pipe sprinkler system
N/A
©2023 Brennan Investment Group. All rights reserved.