349,600 SF
7.4%
25.3 acres
3
1967/68
346
Concrete, steel and CMU
flat, built-up-roofing, EPDM membranes, flat single-ply TPO membranes
Roof 1 - 2018 Roof 2 - 2017 Roof 3 - 1999
packaged, gas-fired roof-top-units, split-systems, gas-fired infrared heaters
2,000-amp, 480-volt, 3 phase, 3 wire
Wet and dry-pipe sprinkler system
N/A
©2023 Brennan Investment Group. All rights reserved.